China / Chaisang, Jiujiang, Jiangxi
Chihu 110 kV Substation Main Transformer Expansion
110 kVSUNENG supplied selected electrical products and components for the Chihu 110 kV substation expansion.
Project context.
The Chihu expansion added a third main transformer to the existing 110 kV substation in Chihu Industrial Park, Chaisang District, Jiujiang. The work introduced one 50 MVA transformer and 4.8 + 3.6 Mvar of reactive compensation, with no additional 110 kV outgoing circuits.
The new transformer sits within the existing outdoor station arrangement, alongside the earlier transformer installations and the 110 kV AIS switchyard. Construction ran from 25 May to 20 September 2024. The equipment views and layout below show how the addition fits into the station.
Electrical scope
- Project location
- Chihu Industrial Park, Chaisang District, Jiujiang, Jiangxi
- Expansion scope
- One new No. 3 main transformer, rated 50 MVA
- Reactive compensation
- One additional group rated 4.8 + 3.6 Mvar
- Station arrangement
- Outdoor main transformers and outdoor 110 kV AIS equipment
- Station configuration after expansion
- Three outdoor main transformers; four existing 110 kV outgoing circuits
- Construction period
- 25 May 2024 to 20 September 2024
Electrical drawings
Review the electrical sheets and their equipment and route annotations.
Field imagery
Station equipment and line routes.
No. 3 transformer addition
The added 50 MVA transformer, its outdoor connections and rating plate.



Existing station setting
Earlier transformer installations and the station entrance provide context for the expansion.