Maolin indoor switchgear building
Project archive

China / Zhengzhou Airport Economy Zone, Henan

Zhengzhou Maolin 110 kV Substation & Lines

110 kV
Main transformer63 MVA
Connection route4.35 km
110 kV circuitsTwo
Capacitor banks2 × 5 Mvar
Selected SUNENG supply scope

SUNENG supplied selected electrical products and components for the Zhengzhou Dayingbei (Maolin) 110 kV substation and line project.

Project context.

The Dayingbei (Maolin) 110 kV project is located in the Zhengzhou Airport Economy Zone. Its first-phase installation includes one 63 MVA indoor main transformer, two 110 kV circuits and two 5 Mvar capacitor banks.

The 4.35 km connection includes 1.65 km of double-circuit overhead line, 2.5 km on mixed-voltage four-circuit towers and 0.2 km of cable. The upper 220 kV circuits on the mixed-voltage section are reserved and were not connected at either end in this phase.

Electrical scope

Station installation
One indoor main transformer and 110 kV GIS equipment.
Double-circuit overhead section
1.65 km.
Mixed-voltage tower section
2.5 km on towers carrying the project's lower 110 kV circuits.
Cable section
0.2 km, including the cable-to-overhead transitions.
220 kV provision
The upper circuits are reserved, with both ends unconnected in this phase.
Construction and commissioning
Construction started in April 2025; commissioning took place in June 2026.

Electrical drawings

Review the electrical sheets and their equipment and route annotations.

Maolin station layout and the installed No. 1 transformer
Maolin station layout and the installed No. 1 transformer
Maolin 110 kV connection: overhead, cable and shared-tower sections
Maolin 110 kV connection: overhead, cable and shared-tower sections

Field imagery

Station equipment and line routes.

Indoor substation equipment

Maolin indoor switchgear building
Maolin indoor switchgear building
No. 1 main transformer, rated 63 MVA
No. 1 main transformer, rated 63 MVA
110 kV GIS room at Maolin substation
110 kV GIS room at Maolin substation
Indoor capacitor installation at Maolin
Indoor capacitor installation at Maolin
Maolin substation viewed from the east
Maolin substation viewed from the east
Station building viewed from the west
Station building viewed from the west

Line connections and crossings

Overhead connection on the south side of Maolin substation
Overhead connection on the south side of Maolin substation
Cable-to-overhead transition on the 110 kV connection
Cable-to-overhead transition on the 110 kV connection
110 kV double-circuit overhead line
110 kV double-circuit overhead line
Connection passing beneath the 500 kV Huaxiang line
Connection passing beneath the 500 kV Huaxiang line
Mixed-voltage tower arrangement along the connection
Mixed-voltage tower arrangement along the connection

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry

Search SUNENG

Find products, solutions, project references and articles.