Xiajin substation and the new 500 kV outgoing-line bay
Project archive

China / Qujiang District and Longyou County, Quzhou, Zhejiang

Qujiang Pumped-Storage 500 kV Outgoing Connection

500 kV
Voltage500 kV
Line route37.678 km
New towers107
Added line bayOne at Xiajin
Selected SUNENG supply scope

SUNENG supplied selected electrical products and components for the Qujiang pumped-storage 500 kV outgoing-connection project.

Project context.

The Qujiang pumped-storage outgoing project connects the power station to Xiajin 500 kV substation. The route passes through Qujiang District and Longyou County in Quzhou, Zhejiang.

The 37.678 km connection combines single-circuit towers with a short section using one side of double-circuit towers. At Xiajin, the work adds one 500 kV outgoing bay and a 60 Mvar shunt reactor on the low-voltage side of No. 4 main transformer.

Electrical scope

Single-circuit section
34.719 km of single-circuit overhead line.
Shared-tower section
2.959 km using one side of double-circuit towers.
Tower arrangement
99 single-circuit towers and eight double-circuit towers.
Conductors
Four-conductor bundles using JL3/G1A-400/35 and JL3/G1A-400/50 conductors.
Optical ground wire
48-core OPGW on the single-circuit section and 72-core OPGW on the double-circuit-tower section.
Substation additions
One 500 kV outgoing bay and one 60 Mvar low-voltage-side shunt reactor at Xiajin.

Field imagery

Station equipment and line routes.

Xiajin substation connection

Xiajin substation and the new 500 kV outgoing-line bay
Xiajin substation and the new 500 kV outgoing-line bay
New low-voltage-side shunt reactor at Xiajin substation
New low-voltage-side shunt reactor at Xiajin substation
New 500 kV line-bay equipment at Xiajin
New 500 kV line-bay equipment at Xiajin

Pumped-storage outgoing line

500 kV outgoing line through the Qujiang hills
500 kV outgoing line through the Qujiang hills
Tower and conductor spans along the pumped-storage connection
Tower and conductor spans along the pumped-storage connection
Tower steelwork and overhead conductor arrangement
Tower steelwork and overhead conductor arrangement
Transmission tower on the ridge corridor
Transmission tower on the ridge corridor
500 kV spans across the hillside route
500 kV spans across the hillside route
Outgoing-line corridor in the reservoir-area landscape
Outgoing-line corridor in the reservoir-area landscape
Tower and spans along the Qujiang connection
Tower and spans along the Qujiang connection

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry

Search SUNENG

Find products, solutions, project references and articles.