Phase II converter transformers at Golmud converter station
Project archive

China / Golmud, Qinghai; Lhasa, Shigatse and Nagqu, Tibet

Qinghai-Tibet ±400 kV HVDC Phase II Expansion

±400 kV DC / 220 kV AC
DC voltage±400 kV
Converter stationsGolmud and Lhasa
Condenser sitesDuolin and Deji
New 220 kV lines45.305 km
Selected SUNENG supply scope

SUNENG supplied selected electrical products and components for the Qinghai-Tibet HVDC Phase II expansion project.

Project context.

The Qinghai-Tibet HVDC Phase II expansion combines work at the Golmud and Lhasa ±400 kV converter stations with synchronous-condenser installations at Duolin and Deji. The electrical scope includes additional converter transformers, dry-type smoothing reactors and AC filter equipment.

The Lhasa connection works add two 220 kV outgoing bays and the Lapeng III and Laduo III lines. Together, these two new lines extend 45.305 km, with a further 0.999 km of associated line relocation. The project brings converter-station equipment, reactive-power support and high-altitude overhead-line connections into one coordinated grid expansion.

Electrical scope

Converter transformers
Each converter station adds six 117.7 MVA units plus one spare.
Smoothing reactors
Four 300 mH dry-type smoothing reactors are added at each converter station.
AC filters
Golmud: 405 Mvar capacity increase; Lhasa: 420 Mvar added capacity.
Synchronous condensers
Duolin and Deji each add one 50 Mvar synchronous condenser and one 63 MVA transformer.
Lapeng III line
25.026 km of new 220 kV line with 67 towers.
Laduo III and relocation
20.279 km of new 220 kV line with 48 towers; associated relocation totals 0.999 km and two towers.

Electrical drawings

Review the electrical sheets and their equipment and route annotations.

Overview of the 220 kV connections around Lhasa converter station
Overview of the 220 kV connections around Lhasa converter station

Field imagery

Station equipment and line routes.

Converter-station expansion

Phase II converter transformers at Golmud converter station
Phase II converter transformers at Golmud converter station
Golmud converter station and the converter-transformer area
Golmud converter station and the converter-transformer area
Phase II converter transformers at Lhasa converter station
Phase II converter transformers at Lhasa converter station
Lhasa converter station overview
Lhasa converter station overview

Synchronous-condenser installations

Transformer serving the Duolin synchronous-condenser installation
Transformer serving the Duolin synchronous-condenser installation
Duolin synchronous-condenser installation and station arrangement
Duolin synchronous-condenser installation and station arrangement
Transformer serving the Deji synchronous-condenser installation
Transformer serving the Deji synchronous-condenser installation
Deji synchronous-condenser installation and station arrangement
Deji synchronous-condenser installation and station arrangement

220 kV overhead connections

Laduo III 220 kV line: tower A2
Laduo III 220 kV line: tower A2
Laduo III 220 kV line: tower A5
Laduo III 220 kV line: tower A5
Lapeng III 220 kV line: tower B2
Lapeng III 220 kV line: tower B2
Lapeng III 220 kV line: tower B4
Lapeng III 220 kV line: tower B4
Lapeng III 220 kV line: tower B6
Lapeng III 220 kV line: tower B6

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry

Search SUNENG

Find products, solutions, project references and articles.