110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
Project archive

China / Nanchang Economic Zone

Nanchang Panlongshan–Lehua Loop-in Jinyuan 110kV Line Project

110kV
LocationNanchang Economic Zone
Route formatOverhead + cable
Recorded routes1.985 km / 1.905 km
Recorded timingOperating, Apr 2026

Project context.

This public project record covers the Panlongshan–Lehua loop-in connection to Jinyuan 110kV substation in Nanchang Economic and Technological Development Zone. The route combines overhead construction with cable sections in an urban infrastructure setting.

Project evidence

Selected field images from the available project record.

110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
Route corridor
110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
110kV tower structure
110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
Tower connection detail
110kV tower and cable terminal infrastructure on the Jinyuan line project in Nanchang
Overhead line environment