Aerial view of Bohai Port No. 1 substation
Project archive

China / Huanghua Port Industrial Area, Cangzhou, Hebei

Cangzhou Bohai Port No. 1 110 kV Substation

110 / 35 / 10 kV
Main transformers2 × 50 MVA
Voltage levels110 / 35 / 10 kV
110 kV circuitsTwo
New connections1.016 km
Selected SUNENG supply scope

SUNENG supplied selected electrical products and components for the Cangzhou Bohai Port No. 1 110 kV substation and connection works.

Project context.

Bohai Port No. 1 substation serves the Huanghua port industrial area in Cangzhou, Hebei. The 110/35/10 kV station installs two 50 MVA outdoor main transformers together with indoor GIS and switchgear.

The project includes a new 110 kV bay at Xigong 220 kV substation and associated line reconnections. The new connection segments total 1.016 km, combining 0.118 km of overhead line with 0.898 km of underground cable.

Electrical scope

Transformer arrangement
No. 2 and No. 3 outdoor main transformers, each rated 50 MVA.
Outgoing circuits
Two 110 kV, six 35 kV and sixteen 10 kV circuits.
Reactive compensation
3 Mvar and 5 Mvar capacitor banks for each main transformer.
First line segment
0.118 km of overhead line plus 0.168 km of cable.
Additional cable segments
0.354 km and 0.376 km of new cable; conductor sizes include 800 mm² and 630 mm².
Upstream connection
One additional 110 kV bay at Xigong 220 kV substation.

Electrical drawings

Review the electrical sheets and their equipment and route annotations.

Station layout with No. 2 and No. 3 main transformers
Station layout with No. 2 and No. 3 main transformers
Bohai Port No. 1 substation connection arrangement
Bohai Port No. 1 substation connection arrangement
Line reconnection arrangement near Xigong substation
Line reconnection arrangement near Xigong substation

Field imagery

Station equipment and line routes.

Bohai Port substation

Aerial view of Bohai Port No. 1 substation
Aerial view of Bohai Port No. 1 substation
Station buildings and outdoor transformer arrangement
Station buildings and outdoor transformer arrangement
No. 2 main transformer at Bohai Port No. 1 substation
No. 2 main transformer at Bohai Port No. 1 substation
No. 3 main transformer at Bohai Port No. 1 substation
No. 3 main transformer at Bohai Port No. 1 substation
Entrance to Bohai Port No. 1 substation
Entrance to Bohai Port No. 1 substation

Overhead and cable connections

110 kV steel-pole line connection
110 kV steel-pole line connection
Steel-pole structure and overhead connections
Steel-pole structure and overhead connections
Cable-to-overhead termination equipment
Cable-to-overhead termination equipment
Cable termination and supporting steelwork
Cable termination and supporting steelwork
Terminal tower for the 110 kV connection
Terminal tower for the 110 kV connection
Terminal-tower steelwork and conductor arrangement
Terminal-tower steelwork and conductor arrangement

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry