Shaanbei-Anhui ±800 kV UHVDC Transmission Project

±800 kV DC
DC voltage±800 kV
Transfer capacity8,000 MW
DC line route1,055.097 km
Line towers2,161
Selected SUNENG supply scope

SUNENG supplied selected electrical products and components for the Shaanbei-Anhui ±800 kV UHVDC transmission project.

Project context.

The Shaanbei-Anhui ±800 kV UHVDC project links Baotashan converter station in Fuxian, Yan’an, Shaanxi, with Hezhou converter station in Lujiang, Hefei, Anhui. The 8,000 MW transmission system crosses Shaanxi, Henan and Anhui.

The DC line extends 1,055.097 km and uses 2,161 towers with six-conductor bundles. Sending- and receiving-end installations include converter transformers, valve halls, DC yards and AC filter banks, with 750 kV AC connections at Baotashan and 500 kV AC connections at Hezhou.

Electrical scope

Provincial route sections
Shaanxi: 244.406 km; Henan: 487.446 km; Anhui: 323.245 km.
Sending-end transformers
Baotashan: 24 converter transformers rated 407.5 MVA, plus four spares.
Receiving-end transformers
Hezhou: 24 converter transformers rated 397 MVA, plus four spares.
AC connections
Nine 750 kV outgoing circuits at Baotashan and eight 500 kV outgoing circuits at Hezhou.
AC filter capacity
Baotashan: 5,045 Mvar; Hezhou: 5,600 Mvar.
Overhead-line arrangement
Bipolar DC line with six-conductor bundles.

Field imagery

Station equipment and line routes.

Baotashan sending-end converter station

Baotashan converter transformers and valve hall
Baotashan converter transformers and valve hall
DC switchyard at Baotashan converter station
DC switchyard at Baotashan converter station
AC filter banks at Baotashan converter station
AC filter banks at Baotashan converter station
750 kV AC equipment at the sending-end converter station
750 kV AC equipment at the sending-end converter station
DC and electrode-line connections at Baotashan
DC and electrode-line connections at Baotashan

Hezhou receiving-end converter station

Hezhou valve hall and converter-transformer area
Hezhou valve hall and converter-transformer area
DC switchyard at Hezhou converter station
DC switchyard at Hezhou converter station
AC filter banks at Hezhou converter station
AC filter banks at Hezhou converter station
Aerial view of the receiving-end 500 kV AC switchyard
Aerial view of the receiving-end 500 kV AC switchyard
DC line approach to Hezhou converter station
DC line approach to Hezhou converter station
500 kV AC connections at the receiving-end station
500 kV AC connections at the receiving-end station
Converter transformer at Hezhou station
Converter transformer at Hezhou station

UHVDC line corridor

UHVDC transmission tower along the mountain corridor
UHVDC transmission tower along the mountain corridor
Aerial view of a UHVDC tower and conductor spans
Aerial view of a UHVDC tower and conductor spans
Tower steelwork and foundations along the UHVDC route
Tower steelwork and foundations along the UHVDC route
UHVDC transmission line across the agricultural corridor
UHVDC transmission line across the agricultural corridor

Discuss a similar requirement.

Send a drawing, BOM, voltage level or technical specification for an initial review.

Start an enquiry

Search SUNENG

Find products, solutions, project references and articles.