China / Wuning, Jiujiang, Jiangxi
Wanfu 110 kV Transmission & Transformation Project
110 kVSUNENG supplied selected power transmission and distribution products and components for the Wanfu substation, connecting bays and line works.
Project context.
The Wanfu project serves the Wuning Industrial Park area in Xinning Town, Wuning County. The completed outdoor substation has two 50 MVA main transformers, outdoor 110 kV HGIS equipment and three outgoing 110 kV bays.
Connections comprise Ningwan I, Ningwan II and Wannan, with a combined route length of 15.252 km. The works also connect two 110 kV bays at Xinning 220 kV substation, including one existing spare bay brought into use, and a new 110 kV bay at Nanshi. The figures below use the completed installation values.
Electrical scope
- Main transformers
- 2 × 50 MVA, outdoor arrangement
- 110 kV equipment
- Outdoor HGIS; 2 outgoing bays toward Xinning and 1 toward Nanshi
- Reactive compensation
- 1 × (4 + 4) Mvar
- Ningwan I line
- 5.499 km; 23 new towers and poles
- Ningwan II line
- 5.654 km; 19 new and 7 reused towers
- Wannan line
- 4.099 km: 3.979 km overhead + 0.12 km cable; 31 new towers and poles
- New-route conductor
- 2 × JL3/G1A-240/30
- Reused-tower conductor
- Ningwan II reused double-circuit section: 1 × JNRLH1/LB20A-240/30
- 110 kV power cable
- YJLW03-Z-64/110-1×1200
- Connecting substations
- Xinning: 2 connecting bays (1 new and 1 existing spare activated); Nanshi: 1 new bay
Electrical drawings
Review the electrical sheets and their equipment and route annotations.
Field imagery
Station equipment and line routes.
Wanfu substation







Line routes and connecting bays